What is a CSC plate, and how do you read one?

The CSC plate is the safety approval plate fixed to a shipping container. It shows who approved the container, when it was built, and how much it can weigh and carry on top. On or next to it, you'll find how the container is kept under examination.

The 6 lines of a CSC safety approval plate, laid out after IMO's model plate, values left blankCSC SAFETY APPROVAL1Country of approval and approval reference2Date of manufacture (month and year)3Manufacturer's identification number4Maximum operating gross mass ...... kg ...... lbs5Allowable stacking load for 1.8 g ...... kg ...... lbs6Transverse racking test force ...... newtons
The plate's 6 standard lines, after IMO's model. Values left blank.

This guide goes through the plate line by line, explains the 2 examination schemes (PES and ACEP), and lists what a surveyor can check on the plate at gate-in. Every rule links to its source at the end.

The CSC Convention in short

CSC stands for the International Convention for Safe Containers, run through the IMO (International Maritime Organization). It was adopted on 2 December 1972 and came into force on 6 September 1977. [1]

It has 2 aims: keeping people safe when containers are handled and carried, and making international transport easier with one set of safety rules. [1]

A container is approved by a country that's party to the Convention (its Administration), or by an organisation acting for it. [1] Once approved, the container carries the safety approval plate. [2] [4]

What each line on the plate means

The plate must be in at least English or French. It starts with the words CSC SAFETY APPROVAL, then gives: [2]

  1. Country of approval and approval reference. This shows the country that approved the container and the approval number. In the US, for example, it takes the form USA, then the approval number, then the year of approval. [4]
  2. Date of manufacture. This is a month and a year.
  3. Manufacturer's identification number. For older containers where that number is unknown, the Administration gives one.
  4. Maximum operating gross mass, in kg and lbs. This is the most the container and its cargo may weigh together. Every other maximum gross marking on the container must match this figure. [2]
  5. Allowable stacking load for 1.8 g, in kg and lbs. This is the load the container is built to carry on top of it, allowing for a vertical acceleration of 1.8 times gravity in transport. [2] [4]
  6. Transverse racking test force, in newtons. This is the sideways force the end frames were tested to resist. [2] [3]

The plate shows 2 more lines only when they apply: [2]

  • End-wall strength, only if the end walls were designed for a force other than 0.4 times the payload's weight.
  • Side-wall strength, only if the side walls were designed for a force other than 0.6 times the payload's weight.

A container approved to run with one door removed also shows its one-door-off stacking and racking values, next to the normal ones. [2] [3]

Containers built before 1 July 2014 may keep their original plate, so older wording and units are still common on the gate. [2]

Limited stacking or racking. If the stacking value is under 192,000 kg, or the racking value is under 150 kN (kilonewtons), the container counts as having limited stacking or racking capacity. It must then be marked conspicuously under ISO 6346, the standard for container codes and markings. [3]

ISO 6346:2022 type codes have a second form for this, such as GB in place of G1. It doesn't cover containers approved for one-door-off operation. [7] Our container ISO code decoder shows it.

PES or ACEP: how the container stays under examination

The owner is responsible for maintaining an approved container and having it examined periodically. [1] There are 2 ways to do it: the Periodic Examination Scheme (PES) and the Approved Continuous Examination Programme (ACEP). Both examine to the same standard; they differ in when the examinations happen. [6]

Under PES, the US rules say a new container's first examination must be within 5 years of its date of manufacture, and after that at intervals of no more than 30 months. [5]

After each examination, the owner marks the month and year before which the container must next be examined. Under the US rules the mark goes on the plate, or on the container as close to the plate as practical, and can be a decal, sticker or stencil. [5] IMO calls this the Next Examination Date (NED). [3]

Under ACEP, the container is examined each time it has a major repair, a refurbishment or an on-hire or off-hire interchange. The gap between those examinations must never be more than 30 months. [5] [6]

Instead of a date, the container carries ACEP and the programme's approval reference near the plate. In the US that reads ACEP, then USA, then the year the programme was approved. [5] [6]

BIC (Bureau International des Containers) keeps a global database where an ACEP number can be checked. [6]

How to read the next examination date

The next examination date is a month and a year, and the container must be examined before that month starts. [5]

If that month has arrived, or passed, and there's no ACEP marking, the container is overdue for examination. [5]

What a surveyor can check on the plate at gate-in

Under the Convention, official checks on containers should be limited to a valid safety approval plate and either an ACEP marking or a valid next examination date, unless there's strong evidence the container is an obvious safety risk. [3] That short check works at a depot gate too:

  • The plate is there and readable. No plate, or a plate you can't read, is the first thing to note on the EIR (equipment interchange receipt).
  • The examination marking is valid. Look for an ACEP marking, or a next examination date in a later month than the current one.
  • The maximum gross mass on the plate matches the door. The Convention requires every maximum gross marking on the container to agree with the plate. [2]
  • Limited stacking or racking is marked. If the plate's values are under 192,000 kg or 150 kN, the container should carry the matching ISO 6346 marking. [3] [7]

The UK's guidance lists what an ACEP examination covers: corrosion, welds, rivets and similar fastenings, mechanical damage, the frame, corner fittings, door and hatch gear, floor and panels, and the validity of the safety approval plate. [6]

The CSC plate in Boxvera

At gate-in, Boxvera asks the surveyor for a photo of the CSC plate and files it on that container's EIR. The camera doesn't read the plate's text, so the surveyor checks it by eye.

If the shipping line later asks about the plate, the photo is on the record.

Sources

  1. IMO, International Convention for Safe Containers (CSC), and Containers.
  2. IMO, Resolution MSC.355(92), amendments to the CSC adopted 21 June 2013: the plate's required content, its model layout, the maximum gross mass rule and older plates.
  3. IMO, Resolution MSC.310(88), amendments to the CSC adopted 3 December 2010: limited stacking and racking, one-door-off markings, the Next Examination Date, and Annex III on control and verification.
  4. US eCFR, 49 CFR Part 451, Testing and approval of containers: the approval number format and the 1.8 g note. These are US rules implementing the CSC.
  5. US eCFR, 49 CFR Part 452, Examination of containers: the 5-year and 30-month intervals, the next examination date marking and the ACEP marking. These are US rules implementing the CSC.
  6. UK Maritime and Coastguard Agency, MIN 633 (M), on ACEP, PES and the BIC ACEP database, published July 2020 (the notice expired in June 2021).
  7. BIC, ISO 6346:2022 type code designation table.

The exact examination intervals and marking formats come from the US rules (sources 4 and 5), the national rules we could read in full. The UK note (source 6) also gives the 30-month ACEP limit. We couldn't open the Convention's full consolidated text, so if a detail matters in a dispute, check with the Administration or body that approved the container or its examination scheme.